Skip to main content

2026 General Assembly

16 June 2026

From 1 until 2 June 2026, the PROSECCO consortium gathered in Lille for the General Assembly and Advisory Board meeting, an important milestone to reflect on progress, strengthen collaboration, and align on the next steps towards future-ready HVDC grids in Europe.

Throughout the meeting, partners shared the latest developments across the project's work packages, including:

  • HVDC protection relays and DC relay testing
  • Transient stability methodologies for AC/DC fault scenarios
  • Protection demonstrators and interaction studies
  • Scheduling and congestion management for hybrid AC/DC grids
  • Power Flow Control demonstrators
  • Model-Based Systems Engineering and use case development

The meeting also provided a valuable opportunity to exchange insights with the Advisory Board and discuss the challenges and opportunities linked to the integration of HVDC technologies into Europe's future energy system.

2026 General Assembly

16 June 2026

European DC-Power Projects Hold Joint Coordination Meeting to Boost Collaboration

27 November 2025
Brussels – 27 November 2025 — On 7 November 2025, seven European projects in DC and hybrid AC/DC grid technologies held a joint coordination meeting to strengthen cooperation and identify synergies. The participating projects included THEUS, DC-POWER, InterSCADA, FLAGCHIP, PROSECCO and SAFEPOWER.

First General Assembly

16 June 2025

PROSECCO project kicked off!

24 February 2025
The virtual kick-off took place on 1 July 2024.

Contact us

Interested in our project?
Contact us and learn more about Prosecco
Logo Prosecco
This project has received funding from the European Union’s Horizon Europe research and innovation programme under grant agreement N° 101160687